Clear answers to complex planning, zoning, reality capture, and coastal building questions in Santa Barbara County.
Permit approval times depend on the scope of your custom build and local planning department backlogs. Simple ADUs and additions can take 3 to 6 months, while complex home designs within strict Coastal Commission boundaries require environmental reviews that can extend the timeline. We coordinate with local boards to expedite approvals.
Yes. A zoning and permitting feasibility audit checks local setback regulations, maximum allowed lot coverage, and height limits. Verifying these boundaries before drafting blueprints avoids planning rejections and costly design revisions.
Under current California state guidelines, most single-family residential parcels are eligible for a detached ADU of up to 1,200 square feet, regardless of local lot coverage limits. However, local height caps, rear/side setbacks (typically 4 feet), and utility access points must still be reviewed. We run a full ADU analysis for your parcel.
Yes. We design commercial layouts, retail structures, office renovations, and tenant improvements (TI). We also create advanced 3D visual walkthroughs and permit documents for commercial builders.
3D laser scanning captures the exact physical dimensions of your existing building or site, producing a high-accuracy point cloud and as-built record. This prevents measurement errors, eliminates repeat site visits, and gives architects, engineers, and contractors reliable information before design and construction move forward.